Posts By :

Ryan Northcott

OwlBox 4K Construction Camera Time-Lapse System & Services

Red Bull Crashed Iced Time-Lapse by OwlBox

Red Bull Crashed Iced Time-Lapse by OwlBox 1399 788 Ryan Northcott

32 Days. 3 Cameras. 64 Skaters. 415 metres. 70,000 people. That’s what it takes to get an amazing time-lapse of the iconic track build of the Red Bull Crashed Ice course in Edmonton, Alberta.¬†Stretching 415 metres from top to bottom, with a 45m vertical drop and 9 turns, capturing the construction of the track was…

read more

OwlBox to Document New Central Library Construction in Calgary

OwlBox to Document New Central Library Construction in Calgary 1280 853 Ryan Northcott

OwlBox is incredibly excited to announce we have been chosen to document construction of the New Central Library in Calgary, Alberta on behalf of CMLC (Calgary Municipal Land Corporation). The project, which aims to be completed in 2018, is a marquee build for the city of Calgary. Located directly east of City Hall in the…

read more