Construction Time-Lapse
AFDE Site C Dam Project
Clean, Renewable, Cost Effective Energy

AFDE Site C | BC Hydro

The Site C project consists of a dam and generating station on the Peace River in northeast BC. It will be the third dam to be built on the Peace River, owned and operated by BC Hydro. Once completed, the project will provide 1,100 megawatts of capacity and about 5,100 gigawatt hours of energy each year to BC’s integrated electricity system – enough energy to power the equivalent of about 450,000 homes per year in BC.

Dam Construction BC Image OwlBox Construction Camera 4K Time-Lapse System and Service

Location

Peace River, BC, Canada

Dam Construction BC Image OwlBox Construction Camera 4K Time-Lapse System and Service

Mounting

Crane Mount

Dam Construction BC Image OwlBox Construction Camera 4K Time-Lapse System and Service

Length

7 Years

Dam Construction BC Image OwlBox Construction Camera 4K Time-Lapse System and Service

Photo Interval

Every 2 Minutes